Our Energy Solutions are Ready in 1 Year and Fit Any Grid Type!

FAQ

Wind is not constant solar is not constant hydro is definitely dependent on water level if you have a drought you will have problems making power. And nuclear waste is still a problem if you don't have a way to deal with the waste other then placing in the ground for someone else to deal with IS also a problem. We can if needed build to provide energy 24/7 without any electric price rate hikes. Unlike other listed on this list other then nuclear power stations everyone else has price rate hikes and they are not usually doing it across the board low rates.

We have used the same mechanical energy engine for over 100 years only change to the front part of what is used. Example Nuclear, Wind, Gas, Oil, Diesel, etc. all use the same mechanical engine to produce power. We are only changing the rules and not using fossil fuels and it can be used 24/7.  

Containers only need room for the trailer of a semi truck. A 1000mw power output will be placed inside a 50,000 sqft building on 1 acre of land.

We can get 1 1000mw power output engine

It's not hard to provide proof we was the first one to make electricity this way.

No worries it's a trade secret.

0 we are using already patented technology and only formed a new way of using them together.

Because the grid has a 5 year backlog to connect to the grid, We want to help with the problems now not 5 years from now.

We are placing our units inside full electric refrigerator container units.

We don't use any fossil fuels to produce electricity. But gearbox and other things that need oil to reduce their own friction and under constant pressure of being used needs lubricant. This is just how things are made.

Yes if the temperature is getting to high inside or a fire is outside caused by something else. There is a 1 55 gallon drum of oil inside.

If you have 160mw or something less. Then that same power will be your backup. So 2 containers 1 constant 160mw and 1 back up 160mw.

The design is different types for each.

Max is 160mw and that is 2 , 80 mw engines.

Get in Touch With Us

Have questions or need more information?
Let us know how many megawatts and the type of energy supply you need (Constant Energy or Backup Energy Supply) and we will get back to you shortly.